Banbury – Tassimo Packing Room

Banbury – Tassimo Packing Room

The project entailed the conversion of the old Max Pac storage area to a new clean room facility for the storage and distribution of the Tassimo range of coffee. This included upgrading work on the floors. The Mastertop 1324 flooring system was selected due to its flexibility, wear resistance and suitability for application over older, existing flooring.

BASF Emaco was used to provide a suitable substrate. The system incorporated anti-slip glass bead for enhanced slip resistance.

Coving was formed using Ucrete RG together with a top coat to match the floor.

A number of expansion joints were placed across the floor to reflect expansion joints in the existing substrate.

Ancorite has provided flooring and refractory services for the plant for a number of years.

PROJECT DETAILS
Mondelez (Kraft) Banbury

Completed: March 2015

Systems: 3mm Mastertop 1324 Slip Resistant Finish

Area: 2400m2

Contract Value: £160,000

Providing project management and construction services for the industrial, commercial and retail sectors.

Get in touch

Head Office
Ancorite Surface Protection Ltd
Millbuck Way
Ettiley Heath
Sandbach
Cheshire
CW11 3AB

Tel: +44 (0)1270 761720
Fax: +44 (0) 1270 761697

Contact
David Clegg, Sales Director
Mob: 07717 684854
david.clegg@ancorite.co.uk
Teesside Office
Ancorite Surface Protection Ltd
Unit 40A and 40B
Cadcam Centre
High Force Road
Riverside Business Park
Middlesbrough
TS2 1RH

Tel: +44 (0)1642 909680
Fax: +44 (0)1642 909680

Contact
Anthony Frain, Contracts Director
Mob: 07717 684851
tony.frain@ancorite.co.uk
Cork Office
Ancorite Surface Protection Ltd
Dun Suairc
Rathduff
County Cork
Ireland
T23 E193

Tel: +353 (0) 86 8511753
Fax: +353 (0) 21 488 6868

Contact
Pat Rogers, Contracts Manager
Mob: +353 (0) 86 8511753
patjrogers@eircom.net
© 2017 Ancorite Ltd
web design by katatomic